| 工程堆积体坡面工程措施减流减沙效应的试验研究 |
| 牛耀彬1,2; 高照良1,3; 刘子壮4; 张少佳1,2
|
| 2015
|
发表期刊 | 南水北调与水利科技
|
卷号 | 13期号:5页码:862-904 |
摘要 | 为了探究工程措施水平阶和鱼鳞坑对工程堆积体陡坡坡面减流减沙和产沙过程的影响,采用径流冲刷试验,
在流量为40L/min,坡度24°、28°、32°范围内对工程堆积体陡坡坡面产流产沙过程进行模拟研究,结果表明:水平阶
和鱼鳞坑在产流前期具有滞缓坡面径流、增加土壤水分入渗的作用;在产流之后两种措施对坡面径流的拦蓄能力微
弱,甚至起到放大的作用;其中鱼鳞坑使坡面径流强度随放水时间的延续出现两次峰值,其坡面土壤剥蚀率变化过
程也出现两次峰值,即产流后第6min和24min;水平阶使径流强度随放水时间的变化呈现阶梯式变化,变化的时
间点不同坡度不尽相同;产流后期,水平阶和鱼鳞坑出现水毁现象,土壤入渗率出现负值,表明产流前期的土壤水补
给径流,导致坡面侵蚀加剧;鱼鳞坑和水平阶使累积产沙量和累积径流量的幂函数相关性降低。对于陡坡坡面排水
渠的设计不仅要考虑最大径流量还要考虑坡面措施的放大作用,对于陡坡坡面径流调控体系而言,工程措施防护效
益的时效性值得考虑。 |
其他摘要 | In order to investigate the effects of engineering measures fish-scale pit and level terrace on the reduction of overland
flow and sediment by the steep slope of engineering accumulation,in this paper,the runoff scouring experiments were used to
simulate the runoff and sediment process in the steep slope of engineering accumulation with the flow of 40L/min and slope of
24°,28°,and 32°.The results showed that(1)fish-scale pit and level terrace can reduce slope runoff and increase soil water infiltration
at the early stage of the production flow;(2)the interception ability of two measures decreases after the production
flow and the two measures even have adverse effects;(3)fish-scale pit can result in two peaks in runoff intensity with the continuation
of discharge time,and soil erosion rate has two peaks as well,which occur after 6and 24minutes of production flow;
(4)level terrace can lead to the staged variation of runoff intensity with discharge time;(5)the water logging phenomenon appears
in the level terrace and fish-scale pit in the later period of production flow,soil infiltration rate is negative,which indicates
that soil water recharges to runoff in the early stage of production flow and leads to the increasing of slope erosion;and(6)fishscale
pit and level terrace have lowered the correlation of power function of cumulative sediment yield and runoff.For the drainage
design of steep slope,the maximum runoff and amplification effect of slope measures are needed to be considered.For the runoff
regulation system of steep slope,the timeliness of the protective benefit of engineering measures is needed to be considered. |
关键词 | 工程堆积体
工程措施
减流减沙
坡面
|
收录类别 | 中文核心期刊要目总览
|
语种 | 中文
|
文献类型 | 期刊论文
|
条目标识符 | sbir.nwafu.edu.cn/handle/361005/9571
|
专题 | 水保所知识产出(1956---)
|
作者单位 | 1.中国科学院水利部水土保持研究所 2.西北农林科技大学水土保持研究所 3.西北农林科技大学资源环境学院 4.中国科学院大学
|
第一作者单位 | 中国科学院水利部水土保持研究所
|
推荐引用方式 GB/T 7714 |
牛耀彬,高照良,刘子壮,等. 工程堆积体坡面工程措施减流减沙效应的试验研究[J]. 南水北调与水利科技,2015,13(5):862-904.
|
APA |
牛耀彬,高照良,刘子壮,&张少佳.(2015).工程堆积体坡面工程措施减流减沙效应的试验研究.南水北调与水利科技,13(5),862-904.
|
MLA |
牛耀彬,et al."工程堆积体坡面工程措施减流减沙效应的试验研究".南水北调与水利科技 13.5(2015):862-904.
|
文件名:
|
工程堆积体坡面工程措施减流减沙效应的试验研究_牛耀彬.pdf
|
格式:
|
Adobe PDF
|
此文件暂不支持浏览
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论