ISWC OpenIR  > 水保所知识产出(1956---)
工程建设弃土弃渣水土流失过程试验研究
其他题名Experimental Study of Soil and Water Loss Processes on Waste Soil and Residue in Project Construction
马春艳; 王占礼; 寇晓梅; 谭贞学; 刘俊娥; 袁殷; 张乃畅
2009
发表期刊水土保持通报
期号3页码:78-82
摘要弃土弃渣是工程建设产生的最主要地面组成物质之一。采用野外放水冲刷试验方法,对黄河班多水电站工程区弃土弃渣水土流失过程进行了研究。(1)不同供水流量下,产流率随供水过程的动态变化整体呈增长趋势,可用幂函数方程描述,开始产流后的5 min内产流过程的变化幅度较大,随后较为平缓,并趋于基本稳定;(2)不同供水流量下,产沙率随供水历时的增长而减少,可用对数相关方程描述,小流量下变化过程波动较小,大流量下变化幅度较大;(3)不同供水流量下,含沙量随着供水历时的增长而减少,可用对数相关方程描述。各流量下的变化趋势基本一致;(4)次产流深、次产沙模数皆随供水流量的增大而增加,增加趋势基本相同,皆可用对数相关方程描述。平均含沙量随供水流量的增大先增加后减小,临界值为7.17 L/min,可用抛物线相关方程描述;(5)次产沙模数随次产流深的增大而增加,表现为很好的正相关关系,可用对数相关方程来描述。
其他摘要Waste soil and residue induced by project construction is one of the main ground materials.Based on field scouring experiment,the processes of runoff and sediment yield on waste soil and residue in the Banduo hydropower station project area in the Yellow River were studied and following results were obtained.(1) Under different flow rates,runoff yield varied with souring time and the relationships can be described by power equations.Runoff yield changed greatly in initial 5 min,then changed slowly,and tende...
语种中文
文献类型期刊论文
条目标识符sbir.nwafu.edu.cn/handle/361005/267
专题水保所知识产出(1956---)
推荐引用方式
GB/T 7714
马春艳,王占礼,寇晓梅,等. 工程建设弃土弃渣水土流失过程试验研究[J]. 水土保持通报,2009(3):78-82.
APA 马春艳.,王占礼.,寇晓梅.,谭贞学.,刘俊娥.,...&张乃畅.(2009).工程建设弃土弃渣水土流失过程试验研究.水土保持通报(3),78-82.
MLA 马春艳,et al."工程建设弃土弃渣水土流失过程试验研究".水土保持通报 .3(2009):78-82.
条目包含的文件 下载所有文件
文件名称/大小 文献类型 版本类型 开放类型 使用许可
工程建设弃土弃渣水土流失过程试验研究.p(268KB) 开放获取使用许可浏览 下载
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[马春艳]的文章
[王占礼]的文章
[寇晓梅]的文章
百度学术
百度学术中相似的文章
[马春艳]的文章
[王占礼]的文章
[寇晓梅]的文章
必应学术
必应学术中相似的文章
[马春艳]的文章
[王占礼]的文章
[寇晓梅]的文章
相关权益政策
暂无数据
收藏/分享
文件名: 工程建设弃土弃渣水土流失过程试验研究.pdf
格式: Adobe PDF
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。